What you have before configuration starts
Service · Advise · Manufacturing consulting
Odoo MRP your planners will trust.
Planners go back to spreadsheets when BOMs and capacity do not match the floor, so we check those first.
MRP review
Before the first MRP run
- Bills of materials
- Levels, kits, yields
- Routings
- Operations and times
- Work centers
- Capacity and shifts
- Strategy
- MTO or MTS
- Costing
- AVCO, FIFO, or standard
- Replenishment
- Reorder rules
What breaks first
Why planners stop trusting Odoo MRP
Six problems that send planners back to the spreadsheet, and most trace to setup, not to Odoo.
- The schedule is rebuilt by handOrders, stock, and machine capacity collated in a spreadsheet every week.
- BOMs live outside OdooNothing links customer demand to the components it needs.
- Capacity is left at unlimitedWork centers without hours produce schedules no shop can run.
- Costing was decided too lateSwitching methods after production is posted forces a full inventory revaluation.
- Sub-assemblies clutter the planFloor-assembled items set up as standard BOMs create orders nobody runs.
- Shortages show up at the machineWithout reorder rules, emergency buying cost our MRP client 15–22% more.
Our MRP client had already dropped a bolt-on MRP that needed every inventory transaction entered twice; Odoo keeps production, stock, and accounting on one database.
What's included
What Odoo manufacturing consulting includes
Six areas, all in Odoo's standard Manufacturing, Inventory, and Purchase apps.
- Bills of materialsMulti-level BOMs, yield factors, kits for sub-assemblies, by-products, checked against usage.
- RoutingsEach operation tied to a work center with setup and cycle times.
- Work centersMachines, stations, and labor pools with hours, shifts, capacity, efficiency, and downtime.
- Make-to-order and make-to-stockRoutes by product category: custom jobs to order, standard items to stock.
- CostingAVCO, FIFO, or standard, chosen with your controller, plus the production accounts.
- MRP your planners trustReorder rules from usage history, a nightly scheduler run, morning exception review.
Results
340 BOMs, 12 work centers, a same-day schedule
From 3-day planning cycles to same-day scheduling
An 85-person custom-parts manufacturer moved 340 BOMs and 12 work centers into Odoo MRP in 14 weeks. The first same-day schedule ran in week 2 after go-live, and production stockouts fell 68% in 90 days.
Odoo MRP case studyThe plan
The five-step Odoo MRP scoping plan
Each step needs someone from your shop who knows the answer.
- Step 1
Audit every BOM and routing
Every finished good: components, quantities, units, sub-assemblies, by-products, and operations.
- Step 2
Map the work centers
Machines, stations, and labor pools: shifts, capacity, efficiency from your production lead.
- Step 3
Lock the costing method
AVCO, FIFO, or standard, decided with your controller before production is posted.
- Step 4
Define quality checkpoints
Where each check happens, who signs off, and what a failure triggers.
- Step 5
Close the loop with Purchase and Accounting
Supplier lead times, minimum order quantities, and production accounts, confirmed before testing.
Industries
Where Odoo MRP consulting matters most
Shops where the schedule, the BOM, and the cost of each job decide the margin.
Discrete manufacturing
Multi-level BOMs and work-center scheduling took planning from 3 days to same day.
Odoo for manufacturingMetal fabrication
Job routings across cutting, welding, and finishing, with heat-number traceability by lot.
Odoo for metal fabricationAutomotive and EV
Altoure now tracks every vehicle across its yards in one Odoo.
Odoo for automotive and EVFAQ
Questions about Odoo manufacturing consulting
What does an Odoo MRP consultant actually do?
Turns how your shop runs into Odoo settings: BOMs, routings, work centers, production strategy, costing, and replenishment. Then we test the schedule against real orders until your planners use it instead of a spreadsheet.
Can Odoo handle make-to-order and make-to-stock in the same plant?
Yes. The strategy is set by product or product category, so custom jobs are built against a sales order while standard items are built to stock. Our MRP client runs both, split by product category.
Which costing method should we use in Odoo: AVCO, FIFO, or standard?
AVCO suits most discrete manufacturers with steady material prices. FIFO fits lot-driven, regulated work such as food or pharma. Standard cost suits high-volume shops that want variance against a set standard. Decide before production data is posted, because changing later means revaluing inventory.
Do we need Odoo Enterprise for manufacturing?
Not always. BOMs, routings, work orders, and reorder rules work in Community. Shop Floor tablets, Quality control points, and the Master Production Schedule need Enterprise. We map what your shop needs and recommend the cheaper edition when it fits. See Odoo Community vs Enterprise.
Our Odoo MRP is live, but nobody trusts the schedule. Can you fix it?
Usually the cause is setup: capacity left at unlimited, BOMs that do not match the floor, or missing reorder rules. We review those first. If the problems go deeper than configuration, that is an Odoo rescue, scoped separately.
How long does an Odoo MRP implementation take?
Our MRP case took 14 weeks, including a two-week parallel run before cutover. We use AI across configuration, development and testing to shorten delivery, and your proposal states the dated plan for your shop.
Show us how your shop plans today.
The first call takes 30 minutes.