Industry · Manufacturing

Odoo MRP that matches your shop floor.

Reorder rules flag shortages days before a job reaches the machine, and the production plan reruns overnight.

68%fewer production stockoutsSame-dayscheduling

Order to shipment

  1. Order confirmedSales
    S00142
  2. MRP plans the jobManufacturing
    WH/MO/00318
  3. Shortages boughtInventory · Purchase
    P00077
  4. Built at work centersShop Floor
    3 of 5 done
  5. Checked per operationQuality
    QC pass
  6. Stocked and costedInventory · Accounting
    Valued
68% fewer stockoutsOne manufacturer, measured at day 90 against its pre-go-live numbers.
AI-assisted deliveryAI speeds up configuration, development and testing; your proposal states your date.
One fixed priceAgreed before kickoff; it only changes if the scope does.

The build

What we configure in Odoo

Standard apps first, custom code only where it pays.

  • ManufacturingMulti-level BOMs with cost rollup, routings, MTO/MTS rules by category.
  • InventoryReorder rules from real usage, lot and serial tracking, multi-step picking.
  • PurchaseProposals from the MRP run, vendor lead times, subcontracting tracked.
  • Shop Floor and BarcodeTablet queue per work center: scan lots, log time, record scrap.
  • QualityPass/fail checks at receipt, operation or final; alerts on the work order.
  • MaintenancePreventive schedules per machine, breakdown requests raised from the floor.
  • PLMEngineering change orders with approvals, BOM and routing versions.
  • AccountingInventory valued as stock moves; AVCO, FIFO or standard costing.
How a make-to-order job runs through OdooOne database, one record trail
  1. OrderSales

    Confirming the order triggers the make-to-order rule.

  2. PlanManufacturing

    A manufacturing order is built from the BOM and routing.

  3. BuyPurchase

    Missing components become purchase orders.

  4. BuildShop Floor

    Operators scan lots, log time and record scrap.

  5. CheckQuality

    Control points pass or fail before the lot moves on.

  6. Ship and billInventory · Accounting

    Delivered and invoiced from the same order.

One record trail:S00142→WH/MO/00318→P00077→Lot 0042→WH/OUT/00521→INV/2026/00087

The problem

What breaks first in a manufacturing shop

Most plants that call us run QuickBooks, spreadsheets and a separate BOM file.

  • Planning takes three daysBuilt by hand, stale before the floor sees it.
  • Stockouts stop the lineReorder points in a spreadsheet; shortages surface at the machine.
  • Emergency buys at a premiumOne client was paying 15–22% premiums before go-live.
  • BOMs live somewhere elseMulti-level BOMs in Access or Excel make costing close to impossible.
  • Paper on the shop floorTravelers and whiteboards mean no live job status or check records.
  • Defects found at the endFound at final inspection, after the scrap is already made.

The change

Before and after

What changes once MRP runs on live data.

AreaBeforeWith Odoo, configured by us
PlanningThree days of spreadsheets every weekOvernight MRP run; planners approve exceptions
MaterialsShortages found at the machineReorder rules flag them days ahead
BOMs and costSeparate database, cost estimated by handOne multi-level BOM, cost rolled up
Shop floorPaper travelers, entered at shift endTablet work orders, live WIP
QualityCaught at final inspectionChecked at the operation, logged per lot

The plan

The plan for a manufacturing shop

Every proposal carries its own dated plan.

  1. Phase 1

    Scope and process map

    Routings, work centers and quality gates documented; one fixed price signed.

  2. Phase 2

    Configure

    BOMs cleaned and imported, capacity modeled, reorder rules from real usage.

  3. Phase 3

    Migrate, rehearse, train

    Open orders and stock loaded, a parallel run, training by role.

  4. Go-live

    Go live and stabilize

    Cutover, 30-day hypercare, then our support desk in Rajkot.

FAQ

Common questions

The questions plant managers and controllers ask before scoping.

Does Odoo support make-to-order and make-to-stock manufacturing?

Yes. Odoo Manufacturing runs both, and the rule is set per product or product category. Shops that build some items to order and keep others in stock run both side by side. A make-to-order route can create the manufacturing order straight from the confirmed sales order.

Can Odoo handle multi-level bills of materials?

Yes. BOMs nest to any depth, with variants, by-products and phantom BOMs for sub-assemblies you never stock. Cost rolls up across every level. We audit every BOM before import, because a sub-assembly set up as the wrong BOM type fills the schedule with orders nobody runs.

Does Odoo MRP work with tablets and barcode scanners on the shop floor?

Yes. The Shop Floor and Barcode apps give each work center a tablet screen. Operators start and finish work orders, scan lots, log scrap and complete quality checks without opening the back office. Shop Floor is an Enterprise app; Barcode is too.

Do we need Odoo Enterprise for manufacturing?

Not always. BOMs, work centers, manufacturing orders and reorder rules run on Community. Shop Floor, Quality, PLM and the planning Gantt need Enterprise. We tell you in scoping which edition your plant needs.

How long does an Odoo manufacturing implementation take?

Our MRP client went live in 14 weeks with 340 BOMs and 12 work centers, including two weeks of parallel running. Your proposal states your date. We use AI across configuration, development and testing to shorten delivery.

How much does an Odoo MRP implementation cost?

It depends on the apps, your BOM and data volume, and the integrations. We do not publish a rate card. We quote one fixed price within five business days of scoping, and it only changes if the scope does.

Start with a 30-minute call.

Bring your BOM count, your work centers and the report you trust least.

Or email sales@octagotech.com