Industry · Manufacturing
Odoo MRP that matches your shop floor.
Reorder rules flag shortages days before a job reaches the machine, and the production plan reruns overnight.
Order to shipment
- Order confirmedSales
S00142 - MRP plans the jobManufacturing
WH/MO/00318 - Shortages boughtInventory · Purchase
P00077 - Built at work centersShop Floor
3 of 5 done - Checked per operationQuality
QC pass - Stocked and costedInventory · Accounting
Valued
The build
What we configure in Odoo
Standard apps first, custom code only where it pays.
- ManufacturingMulti-level BOMs with cost rollup, routings, MTO/MTS rules by category.
- InventoryReorder rules from real usage, lot and serial tracking, multi-step picking.
- PurchaseProposals from the MRP run, vendor lead times, subcontracting tracked.
- Shop Floor and BarcodeTablet queue per work center: scan lots, log time, record scrap.
- QualityPass/fail checks at receipt, operation or final; alerts on the work order.
- MaintenancePreventive schedules per machine, breakdown requests raised from the floor.
- PLMEngineering change orders with approvals, BOM and routing versions.
- AccountingInventory valued as stock moves; AVCO, FIFO or standard costing.
- OrderSales
Confirming the order triggers the make-to-order rule.
- PlanManufacturing
A manufacturing order is built from the BOM and routing.
- BuyPurchase
Missing components become purchase orders.
- BuildShop Floor
Operators scan lots, log time and record scrap.
- CheckQuality
Control points pass or fail before the lot moves on.
- Ship and billInventory · Accounting
Delivered and invoiced from the same order.
The problem
What breaks first in a manufacturing shop
Most plants that call us run QuickBooks, spreadsheets and a separate BOM file.
- Planning takes three daysBuilt by hand, stale before the floor sees it.
- Stockouts stop the lineReorder points in a spreadsheet; shortages surface at the machine.
- Emergency buys at a premiumOne client was paying 15–22% premiums before go-live.
- BOMs live somewhere elseMulti-level BOMs in Access or Excel make costing close to impossible.
- Paper on the shop floorTravelers and whiteboards mean no live job status or check records.
- Defects found at the endFound at final inspection, after the scrap is already made.
The change
Before and after
What changes once MRP runs on live data.
| Area | Before | With Odoo, configured by us |
|---|---|---|
| Planning | Three days of spreadsheets every week | Overnight MRP run; planners approve exceptions |
| Materials | Shortages found at the machine | Reorder rules flag them days ahead |
| BOMs and cost | Separate database, cost estimated by hand | One multi-level BOM, cost rolled up |
| Shop floor | Paper travelers, entered at shift end | Tablet work orders, live WIP |
| Quality | Caught at final inspection | Checked at the operation, logged per lot |
The plan
The plan for a manufacturing shop
Every proposal carries its own dated plan.
- Phase 1
Scope and process map
Routings, work centers and quality gates documented; one fixed price signed.
- Phase 2
Configure
BOMs cleaned and imported, capacity modeled, reorder rules from real usage.
- Phase 3
Migrate, rehearse, train
Open orders and stock loaded, a parallel run, training by role.
- Go-live
Go live and stabilize
Cutover, 30-day hypercare, then our support desk in Rajkot.
Results
What changed for our clients
One client, measured at day 90 against the numbers they ran before go-live.
Case study · Manufacturing
From 3-day planning cycles to same-day scheduling
A custom-parts manufacturer with 85 staff moved 340 BOMs, 12 work centers and its planning into Odoo MRP in 14 weeks.
By segment
Manufacturing segments
Three segments where the Odoo build differs from a general plant.
Metal fabrication
Job costing, heat-number traceability, remnants and outside processing.
Odoo for metal fabricationChemical manufacturing
Formulas as BOMs, lots with expiry, quality checks, a custom COA report.
Odoo for chemical manufacturingMedical supplies
Lot, expiry and recall control for makers and distributors.
Odoo for medical suppliesFAQ
Common questions
The questions plant managers and controllers ask before scoping.
Does Odoo support make-to-order and make-to-stock manufacturing?
Yes. Odoo Manufacturing runs both, and the rule is set per product or product category. Shops that build some items to order and keep others in stock run both side by side. A make-to-order route can create the manufacturing order straight from the confirmed sales order.
Can Odoo handle multi-level bills of materials?
Yes. BOMs nest to any depth, with variants, by-products and phantom BOMs for sub-assemblies you never stock. Cost rolls up across every level. We audit every BOM before import, because a sub-assembly set up as the wrong BOM type fills the schedule with orders nobody runs.
Does Odoo MRP work with tablets and barcode scanners on the shop floor?
Yes. The Shop Floor and Barcode apps give each work center a tablet screen. Operators start and finish work orders, scan lots, log scrap and complete quality checks without opening the back office. Shop Floor is an Enterprise app; Barcode is too.
Do we need Odoo Enterprise for manufacturing?
Not always. BOMs, work centers, manufacturing orders and reorder rules run on Community. Shop Floor, Quality, PLM and the planning Gantt need Enterprise. We tell you in scoping which edition your plant needs.
How long does an Odoo manufacturing implementation take?
Our MRP client went live in 14 weeks with 340 BOMs and 12 work centers, including two weeks of parallel running. Your proposal states your date. We use AI across configuration, development and testing to shorten delivery.
How much does an Odoo MRP implementation cost?
It depends on the apps, your BOM and data volume, and the integrations. We do not publish a rate card. We quote one fixed price within five business days of scoping, and it only changes if the scope does.
Start with a 30-minute call.
Bring your BOM count, your work centers and the report you trust least.
Or email sales@octagotech.com- USA +1 917 254 9416
- India +91 8153897751