Industry · Chemical manufacturing

Odoo for chemical plants that test every batch.

A COA printed from the batch's own test results ships with every delivery, instead of one retyped from the lab notebook.

20+implementations

Supplier lot to customer

  1. Received under supplier lotInventory · Lots
    Lot R-2291
  2. Checked against supplier COAQuality
    QC pass
  3. Batch made from approved formulaManufacturing · PLM
    WH/MO/00057
  4. Sampled and testedQuality
    In spec
  5. Drums filled, expiry setInventory · Lots
    Lot B-0917
  6. Earliest expiry ships firstInventory · FEFO
    Traced
One report for a recallEach finished lot links to its batch and every raw material lot in it.
Earliest expiry ships firstExpiry, best-before and alert dates per lot, with FEFO removal.
One fixed priceAgreed before kickoff; it only changes if the scope does.

The build

What we configure in Odoo

Quality, PLM and Documents are Enterprise apps; the COA and hazmat items are custom work, and we say so in the proposal.

  • ManufacturingFormulas as BOMs scaled to any batch size, co-products with a cost share.
  • PLMFormula changes as change orders, approved by QA, earlier versions archived.
  • Lots and expiryLot tracking on raw materials and batches; expiry and alert dates; FEFO removal.
  • QualityIncoming checks against supplier COAs, measurement checks per batch, alerts on the failing lot.
  • COA reportsA custom report from the lot's test results, printed with the delivery.
  • Units and packagingBuy by the ton, stock by the kg; drums and totes with fill quantities.
  • Documents and hazmatCurrent SDS stored per product, old versions kept; UN number and hazard class fields.
  • AccountingBatch cost from components and work-center time; AVCO, FIFO or standard costing.
How a batch runs through OdooFrom supplier lot to certificate
  1. ReceiveInventory

    Raw materials arrive under their supplier lot numbers.

  2. Test inQuality

    Incoming checks before a lot is released to production.

  3. BatchManufacturing · PLM

    The batch order consumes lots by approved formula version.

  4. Test outQuality

    In-process and final results recorded against the batch.

  5. FillManufacturing · Inventory

    Filled into packaging units, with expiry on the finished lot.

  6. ShipInventory · COA report

    The delivery goes out with the lot's certificate of analysis.

One record trail:WH/IN/00031→Lot RM-0117→WH/MO/00318→Lot 0042→WH/OUT/00521→COA 0042

The problem

What breaks first in a chemical plant

A typical batch plant keeps formulas in spreadsheets, batch sheets on clipboards and COAs in Word files.

  • Formula versions driftNobody can say which spreadsheet version made a given batch.
  • A recall takes a day of diggingTracing a bad lot means paper batch sheets and old email threads.
  • COAs retyped for every shipmentCopied from the lab notebook; a typo can ship with the drum.
  • Shelf life lives on the labelExpiry and retest dates on drum labels, so older stock gets missed.
  • Kilos in, liters out, drums soldBought by weight, batched by volume, sold by drum; converted by hand.
  • Hazard documents out of dateSDS files in a shared folder; nobody is sure which is current.

The change

Before and after

What changes once every batch lives on one record.

AreaBeforeWith Odoo, configured by us
FormulasSpreadsheet copies, version unclearOne active BOM version, changes approved
Recall traceA day spent in paper batch sheetsOne traceability report, lot to customer
COAsRetyped from the lab notebookPrinted from the batch's own test results
Shelf lifeExpiry written on the drum onlyExpiry per lot, earliest shipped first
UnitsKilos, liters and drums converted by handUnits and packaging set per product

The plan

The plan for a chemical plant

Every proposal carries its own dated plan.

  1. Phase 1

    Scope and process map

    Formulas, batch steps, test points and packaging documented; one fixed price signed.

  2. Phase 2

    Configure

    Formulas loaded as BOMs, lot and expiry rules set, COA report built.

  3. Phase 3

    Migrate, rehearse, train

    Stock loaded by lot and expiry, a parallel run, training by role.

  4. Go-live

    Go live and stabilize

    Cutover, 30-day hypercare, then our support desk in Rajkot.

FAQ

Common questions

The questions plant managers and QA leads ask before scoping.

Can Odoo manage chemical formulas and batch sizes?

Yes. Each formula is a bill of materials with components in kg, liters or any unit, and a manufacturing order scales it to the batch size you enter. By-products, and co-products with a cost share, sit on the same BOM. With PLM on Enterprise, formula changes go through approved change orders and earlier versions stay on file.

Does Odoo support lot traceability for recalls?

Yes. With lot tracking on, every receipt, batch and delivery records its lot numbers. The traceability report follows a lot back to its raw materials and forward to every customer delivery, which is the list a recall starts from. A full electronic batch record with signatures is custom work.

Can Odoo track expiry and retest dates on chemical lots?

Expiry, yes. With expiration dates switched on, each lot carries expiry, best-before, removal and alert dates, and FEFO picking ships the earliest-expiring lot first. Odoo has no separate retest-date field, so we use the alert date for retest reminders or add a field if you track both.

Can Odoo print certificates of analysis and GHS labels?

Not out of the box. Quality checks record each batch's measured results, and we build the COA as a custom report that prints them for the shipped lot. GHS labels need a custom label report or your existing labeling software. Odoo stores SDS files in Documents but does not write them.

How long does an Odoo implementation take for a chemical manufacturer?

Our closest published case, an 85-person custom-parts manufacturer with 340 BOMs and 12 work centers, went live on Odoo MRP in 14 weeks. A plant with many formulas to clean up, several test points per batch or custom COA and label formats can take longer. Your proposal states your date and one fixed price before kickoff. We use AI across configuration, development and testing to shorten delivery.

How much does Odoo ERP for chemical manufacturing cost?

It depends on the apps, the number of formulas and test points, and the reports and labels you need built. We do not publish a rate card. We quote one fixed price within five business days of scoping, and it only changes if the scope does.

Start with a 30-minute call.

Bring your formula count, a COA you send today and the lot you would least like to trace by hand.

Or email sales@octagotech.com